Church Basement |
Click on a photo to see a larger version of it, or to enter the slideshow. |
| On March 30th, rummage was moved to the Parish Hall in preparation for the annual rummage sale, enabling structural engineer Earl Moldavan to take a close look a the south wall of the church basement. On March 31st, cabinets were removed from that wall, and a section of the brickwork exposed for inspection. Ceiling joists were inspected and the drainage from gutters and downspouts tested. |